Capella Laboratory, Cambridge, UK

  • Building type:
  • Education & Culture
Fullscreen map Close

A new laboratory for Cambridge University based on the Addenbrooks Hospital site.

489 DELTABEAM® Composite Beams equalling 2.75km were included in the design which required very low response factors due to sensitive lab equipment.

The original cast-in-situ design was for a 700 mm deep slab but after many calculations, it was shown that D32-500 DELTABEAM® Composite Beams along with 300 mm deep hollow-core with a 200 mm structural topping would meet the vibration performance specification.

DELTABEAM® Composite Beams, along with other offsite methods allowed the construction time to be 20 weeks faster and reduced over 500 truck deliveries when compared to the original cast-in-situ solution.

Read more down-arrow.png

Our onsite construction program was 20 weeks faster and saved over 2,500 man weeks in comparison with the envisaged in-situ solution. Additionally the overall carbon footprint was significantly reduced with fewer truck deliveries and high quality offsite production of the steel Deltabeams and precast concrete units.

Nickie Brown, Managing Director PCE Ltd

Project facts

Project size:
17,000 m2
Project floors:
7
Construction company:
PCE Ltd
Structural Engineer:
ARUP
Architect:
Fairhurst Design Group
Delivery year:
2016
Completion year:
2017