Federal Chancellery of Germany, Berlin, Germany

  • Building type:
  • Other Public Buildings
Fullscreen map Close Street View

Bolted connections for precast concrete parts in the largest government headquarters in the world

In order to build the Federal Chancellery in Berlin, Peikko's bolted connections were used for the precast concrete elements, some of which were made in white pigmented exposed concrete.Anchor bolts and column shoes for precast columns as well as wall shoes in connection with anchor bolts enabled efficient assembly of the reinforced concrete supporting structure.  

Together with the Marie-Elisabeth-Lüders House and Paul-Löbe Building, the Federal Chancellery is part of the "Federal Belt" (German: "Band des Bundes"), an architectural symbol of the German unity. The building complex was built when the goverment of Germany moved from Bonn to Berlin about ten years after the German reunification 1989.

Read more down-arrow.png

The construction with its unusual variety of shapes in exposed concrete required very high standards in structural design and building physics.

GSE Ingenieurgesellschaft mbH

Project facts

Project size:
25347 m2
Project floors:
8
Developer:
Im Auftrag der Bundesrepublik Deutschland für die Bundesregierung Bundesbaugesellschaft Berlin
Construction company:
Arge Rohbau Bundeskanzleramt, Hmb Hallesche Mitteldeutsche Bau AG, Wayss & Freytag AG, Hoch- und Wirtschaftsbau, Cubiertas Y Mzov GmbH
Structural Engineer:
GSE Ingenieurgesellschaft mbH
Architect:
SCHULTES FRANK ARCHITEKTEN
Completion year:
2001