Current site: Peikko Canada (English). Do you want to change country or language?
A new logistics building of nearly 77,000m² which is divided into nine cells. The PETRA® Slab Hangers allowed a quick installation of the hollow-core slabs.
This is the first time using PETRA® Slab Hangers for the Eurobéton team. The installation of the floor was made easier by thier use
Sabri ALPTUNA