RHKW waste burning plant, Linz-Mitte, Austria

  • Building type:
  • Energy Construction
Fullscreen map Close

The RHKW waste burning plant in Linz, Austria was built with a precast concrete frame connected with Peikko’s Anchor Bolts, Columns Shoes and Beams Shoes. Peikko also delivered a substantial amount of Fastening Plates to the site.

Project facts

Developer:
LINZ AG
Construction company:
Bilfinger Berger BauGmbH, Linz
Structural Engineer:
BHM Ingenieure, Linz
Precaster:
HABAU Hoch- und Tiefbau, Perg
Delivery year:
2010
Completion year:
2011